00:00What is the normal load?
00:00If you have the normal load, it will be put this on the normal load.
00:07This is the one that will be built.
00:09After this, the other load will be used.
00:11After this, the other load will be used.
00:13This is the first floor input input.
00:16This is when it will be done.
00:17This is the first floor input.
00:18This is the K-electric Sinkle Phase.
00:21Right, the inverter is going on.
00:23This is the three phase selector.
00:26after the third phase it's got re-place
00:35if you don't take the first phase, you can change it
00:36first, you can go through it .
00:39with solar, you can ruin it
00:41on the stage , it's 2
00:44it's 2
00:45and which means which is on the stage
00:47this means which is basically disconnected
00:49this is exactly half-road, so it's 0
00:50oh, right, right
00:52P 원리, okay.
00:55Soler, right.
00:56Soler, right.
00:57So we can use it in solar.
00:58People will use it at the time, and people will use it at the time, later.
01:04But we can use solar.
01:08It's better to use it in solar.
01:11Because the paste is there.
Comments