00:01foreign
00:13foreign
00:16total is here 464 km
00:20which are from 3 states
00:2133, Urisa and Anpardes
00:24� ھولیشہ का part 240 km
00:28جس کو 8 package میں ڈبھائیڈ کے آئیا ہے
00:32پسچکی 7 package 1-8 کے بیچ میں
00:36وہ complete ہو چکا ہے
00:38OD 5 میں کام چل رہا ہے
00:40وہ بھی final stage میں ہے
00:43اور ہم لوگ اس کو اسے سمبر تک ختم کر لیں گے
00:46اس کے بعد جو 2 states ہیں
00:4936 گڑھ ہے اور آندھرا
00:50جیدی وہاں پر سکر complete ہو جاتی ہے
00:53so hopefully November to March to operation
00:58this corridor has been given a lot of
01:04adhonic systems
01:05to create this system
01:09to create this system
01:14which is the automatic control center
01:16management control system
01:18what happens is that
01:20you can see the road from 24 to 7.
01:23There are some breakdowns and people are stuck.
01:27Immediately, this message will be reached in control.
01:30People will be able to get the response and attend.
01:35For this reason, we have run a green drive.
01:39In this section, we have 2.5 lakhs plantations.
01:49the local soil
01:52and the local soil
01:53are familiar
01:55the trees are placed
01:57the green trees
01:59the other way
02:01the other way
02:04the other way
02:05the other way
02:09the maximum land
02:10on the other way
02:13the other way
02:15the maximum tree plantation
02:22the other way
02:23the wild trees
02:24the other way
02:26the other way
02:27the tourist road
02:29has come to be
02:33at this point
02:35in some way
02:37the entire land
02:37is the same
02:39the entire river
02:39has been
02:41the same
02:43for other cities
02:44But in the state of international affairs, the city will be doing the job of the country.
02:55The state will be the work of the country, the government and the government will be the work of the
03:03country.
03:04So, how much time do you get to this situation? How much time do you get to this situation?
03:13And I will be happy to see you on the way of the city of St. S. S. S. S.
03:23S. S. E.T.V.