Skip to playerSkip to main content
  • 2 days ago
સરકાર દ્વારા જામનગર, સુરેન્દ્રનગર, રાજકોટ, મોરબી સહિત સૌરાષ્ટ્રભરમાં ઉદ્યોગોને મળતી ઔદ્યોગિક વીજળીમાં કાપ મુકવાનો નિર્ણય કરવામાં આવ્યો છે

Category

🗞
News
Transcript
00:00In the beginning, PG-Vissel is the most important part of the power cup model of PG-Vissel in our
00:15video conference.
00:47This is the case of the PGVC.
00:50We have no industrial power in this case.
00:55We have no idea of the PGVC.
01:00However, the PGVC is not the case of the PGVC.
01:07We have no idea of this.
01:07This is the case of solar power generation.
01:15The power generation is lower than the power generation.
01:25The power generation is lower than the power generation.
01:36The power generation is lower than the power generation.
01:42아니면 power generation is lower than juste power at the earth.
01:51The truth is that power STE daysел is higher than the power generation.
02:05In this case, there are 100% of the power cup in the 40 days.
02:20Because the power cup is not full of time, the time is not full of time.
02:26The one that is the same thing that we do not have to do is to do this, and the
02:31delay is due to the payment.
02:35The same thing that we have to do is to do this, and to do that, we have to do
02:44this.

Recommended