Water curling back under the panel edge and running down your fascia? Eave trim is the first piece of metal on an exposed-fastener metal roof. Panel makers say it keeps water off the fascia and out from under the roof, and the kick at the bottom steers drips away from the board. Here's the order of work and the 5 install steps, checked against panel makers' install guides.

WHY WATER GETS BEHIND
- Water clings to an edge and wraps back under it. Without eave trim it runs down the fascia board.
- Order matters: the panel guides we checked (Bridger Steel PBR, Metal Sales Classic Rib) put the eave trim on first, before any panel.
- Get the trim bent for your pitch so the face hangs plumb on the fascia (90 degrees + your roof angle: about 108 on a 4/12, about 117 on a 6/12). Panel makers ask you to specify the slope.

INSTALL IN 5 STEPS
1. At the corner, run the trim 1 in past the edge, mark the fascia line, snip, and fold the tab around the corner.
2. Flange flat on the deck, pointing to the ridge, face tight to the fascia. Fasten about every 12 in.
3. Lap the next piece. One guide says 2 in minimum (Bridger); another laps 3 in with sealant in the lap (Western States).
4. Underlayment: makers differ. One runs it over the trim flange (Bridger). Another sets the trim on top of the underlayment, then adds a peel-and-stick strip over the flange (Western States). Follow your panel maker.
5. Tape sealant on the flange, foam closures on the tape, then panels 1 to 2 in past the eave (Bridger). Screw through panel, closure and tape (Metal Sales).

GOOD TO KNOW
- This is the eave detail for screw-down (exposed-fastener) panels: R panel, PBR, corrugated. Standing seam has its own eave detail.
- Six feet up or more: use fall protection.
- Details vary by roof system: check your panel manufacturer's details and your local code.

The trim in the video: 3-1/2 in flange, 4 in face, 1/2 in open drip kick (no hem, so wear gloves), 26 gauge (0.019 in) painted aluminum, brown or white. 105 degree bend for 2/12-4/12 roofs or 117 degree for 5/12-7/12. 21 in or 48 in pieces in packs of 2 to 10. Screw-down panels only, not standing seam. Fasteners, tape and closures not included. Link at the top.

More roof flashings and trims: https://www.ebay.com/str/metalworkssupplyco

Sealant we use in flashing laps:
Sika NP1 sealant, 12-pack (paid link): https://www.amazon.com/dp/B0D9C5HLC1?tag=roofingprosto-20

As an Amazon Associate I earn from qualifying purchases.

CHAPTERS
0:00 The leak at the eave
0:10 Why water gets behind, and the bend
0:26 Install in 5 steps
0:59 Limits, recap + the eave trim

#metalroofing #howto #eavetrim #dripedge #roofingtips

Metal roof eave trim (drip edge with kick, 2 bends, brown or white): https://www.ebay.com/itm/198805743605

Recommended