Metal roof leaking where the panels stop at a wall? Caulk alone won't fix it. This animated how-to shows the layered standing seam endwall (headwall) flashing detail in 6 steps, plus the Z closure most people install backwards.

1. Run the underlayment up the wall, at least 3 in. (Lyon Metal Roofing install guide).
2. Box the panel end without cutting the ribs.
3. Butyl tape, then a Z closure between the ribs: flange toward the wall, lip pointing down the roof. Screws every 4 in.
4. Vertical bead of Sika NP1 where each Z meets the rib.
5. Butyl on the back of the endwall flashing, hook it over the Z lip, screw to the wall every 16 in., rivet the hem every 18 in.
6. Tuck the wall leg behind the house wrap and siding.

Flip the Z: flange toward the wall, lip toward the eave, so the flashing covers every screw. Always follow your panel manufacturer's details and local code.

Matching flashing, Z closures and trim in my eBay store: https://www.ebay.com/str/metalworkssupplyco
Sika NP1 sealant, 12-pack (paid link): https://www.amazon.com/dp/B0D9C5HLC1?tag=roofingprosto-20
Butyl tape (paid link): https://www.amazon.com/dp/B079TG6XGW?tag=roofingprosto-20
As an Amazon Associate I earn from qualifying purchases.

Chapters
0:00 Underlayment up the wall
0:14 Box the panel end + Z closure on butyl
0:31 NP1, endwall flashing, wall leg behind the wrap
0:54 The Z closure most people put in backwards

#standingseam #metalroofing #endwallflashing #headwallflashing #roofflashing #roofingtips

Recommended