Skip to playerSkip to main content
Master Pipe Network Editing in Autodesk Civil 3D with this step-by-step tutorial. In this lesson, you will learn how to edit and modify pipe networks graphically and use the built-in Pipe Network Tools to manage pipes and structures more efficiently.

This tutorial covers practical Civil 3D pipe network editing workflows to help you improve your skills in stormwater drainage, sewerage systems, and underground utility design.

What You Will Learn in This Tutorial:
How to Edit Pipe Networks Graphically in Civil 3D
How to Edit Pipe Networks Using Pipe Network Tools
How to Modify Pipes and Structures
How to Adjust Pipe Network Components
How to Edit Pipe Network Layouts
How to Manage Pipe Network Properties
How to Improve Pipe Network Design and Coordination

Professional Pipe Network Editing Workflow

Whether you are a Civil Engineer, CAD Technician, BIM Modeler, or Civil 3D learner, this tutorial will help you understand essential pipe network editing tools and workflows.

Learn Autodesk Civil 3D

Visit our YouTube channel Autodesk 786 to learn Autodesk Civil 3D from Basic to Advanced level with practical tutorials and infrastructure design workflows.

Subscribe to Autodesk 786 and turn on notifications so you never miss a new tutorial.

Watch more tutorials on:
Civil 3D Pipe Network Design
Stormwater Drainage Network
Sewerage Network Design
Pressure Pipe Network
Road Design and Corridor Modeling
Profile Creation and Cross Sections
BIM and Infrastructure Coordination

#AutodeskCivil3D #Civil3DTutorial #PipeNetwork #PipeNetworkEditing #Civil3DPipeNetwork #StormwaterDrainage #SewerageNetwork #BIM #InfrastructureDesign #CivilEngineering #Autodesk786
Transcript
00:09In the drawing we now have the networks drawn in profile views.
00:14We're going to make some changes to the network in both plan and profile.
00:18In the upper viewport we're looking at the junction of McAulister Boulevard and Sycamore Heights.
00:24In the bottom viewport zoom to structure MH5 as shown.
00:30In the top viewport select the structure. The editing grips are displayed.
00:37The square grip allows you to move the structure and the circle grip will rotate the structure.
00:46Use the square grip to move the structure to a new location.
00:50When you move a structure the connected pipes stay connected and move with the structure.
00:57In the profile view notice that the rim elevation of the structure remains connected to the reference surface.
01:05Move the structure back to the intersection of the alignments as shown.
01:10Now select the pipe to the right of the structure.
01:13The square grip in the middle of the pipe will enable you to move the entire pipe to a new
01:20location.
01:21The direction of the pipe remains fixed.
01:27Turn on dynamic input on the status bar.
01:31If it's not visible use the customization button as shown to make it visible.
01:38With dynamic input turned on, the arrow grip in the middle of the pipe allows you to change the pipe
01:45diameter or width.
01:47Dynamic input allows you to view a readout of the selected pipe size in feet.
01:53You could also type a value into the input field.
01:57Zoom to the left hand end of the pipe and select it again.
02:02The arrow grip at the end of the pipe allows you to shorten or lengthen the pipe.
02:09You can see in the structure properties here that the connections show three pipes are still connected.
02:15You can use this feature to change the position of the end of the pipe within the manhole structure.
02:23The square grip at the start or end of the pipe allows you to move the point to a new
02:27location,
02:29disconnecting it from the structure and changing the pipe direction.
02:34You can reconnect a pipe to a structure by using the square grip and dragging the end point back over
02:41the structure
02:42until the connection symbol is displayed.
02:45Now pan across in the top viewport to the pond.
02:50In the bottom viewport pan the profile view to show the structure at the pond.
02:57This structure is currently a manhole but should be a headwall.
03:02Select the structure in plan.
03:05Right click and choose swap part.
03:09In the swap part size dialog select one of the concrete rectangular winged headwall parts and click OK.
03:18You can see that the part has changed in the profile view although in plan it still shows as a
03:24circle.
03:27Select the structure in plan.
03:29Right click and open the structure properties.
03:33On the information tab set the style to headwall.
03:37This shows the headwall in its true shape.
03:40You can now select the headwall and rotate it so that it is parallel with the embankment.
03:47In the profile view we need to adjust the position of the pipe relative to the pond.
03:54Select the pipe and using the central square grip move it up in the view.
04:00You can use the diamond grips on the end of the pipe to adjust the crown, center or invert elevation
04:06of the pipe.
04:08By selecting two adjacent pipes you can use the diamond grips to grip edit the ends of the two pipes
04:15to the same elevation as shown.
04:20The headwall is currently placed inside the embankment of the pond.
04:25We can adjust its position in plan so that it sits on the edge of the pond in the profile
04:31view.
04:33In the profile you can use the arrow grip on the top of a structure to edit its top or
04:39rim elevation.
04:41Now using the object viewer review the position of the headwall relative to the pond.
04:48We have part of our pipe network shown in plan and in profile.
04:52We are going to edit the network using the pipe and structure properties and some other methods.
04:59Select pipe P7 in the plan.
05:02Right click on it and choose pipe properties.
05:06You can also use pipe properties from the pipe network contextual ribbon tab.
05:12In the pipe properties on the information tab you can edit the pipe name and description
05:18and change the pipe style and render material.
05:21Go to the part properties tab.
05:24The pipe flow direction method sets the rule that is used to determine the direction of flow in the pipe.
05:31The reference surface changes the surface used to determine the cover depth of the pipe.
05:38In the geometry section you can change the slope of the pipe holding either the start or the end of
05:44the pipe fixed.
05:46Change the value of pipe slope hold start to minus 1% and click apply.
05:54Note the updated pipe in the profile view.
05:57Change it back to minus 0.49% and click apply.
06:02You can edit the pipe elevations of either end of the pipe by invert, crown or centre line of the
06:08pipe.
06:09You can also edit the coordinates of either end of the pipe.
06:13Change the end invert elevation to 647 feet and click apply.
06:18Then change it again to 648 feet and click apply.
06:23The resize behavior controls which elevation remains fixed if the pipe size is changed.
06:31Set the resize behavior to crown.
06:34Now if the pipe size is changed the crown elevation will be used for the elevation of the pipe.
06:39The hydraulic properties are only used when the pipes are analyzed and can be used to store information about the
06:47results.
06:49Under part data the Manning coefficient can record the roughness coefficient of the pipe material for flow analysis.
06:58The Hayes and Williams and Darcy Weisbach factors are alternatives.
07:03At the bottom is the inner pipe diameter which can be used to change the diameter of the pipe.
07:09Change the inner pipe diameter to 24 inches and click apply.
07:17You can see in the profile view the crown has been held fixed.
07:21Change the inner pipe diameter back to 12 inches.
07:27On the rules tab you can review the pipe rules that were applied to the pipe together with their actual
07:33values.
07:35And you can check the status of the rules.
07:38Here you can see both the minimum slope and minimum cover depth rules were violated.
07:44If I were to change the slope of the pipe in the part properties so that it meets the slope
07:49rules,
07:50you can see that back in the rules tab the minimum slope warning has been removed.
07:56Click OK to dismiss the dialog.
07:59Now select the structure MH7.
08:03Right click and choose structure properties.
08:07On the information tab we have the same options for changing the name and styles for the structure.
08:14On the part properties tab we can change the reference surface that is used to calculate the rim elevation of
08:20the structure.
08:21You can see the structure update in the profile view if you swap the reference surface.
08:28Under geometry you can change the rotation and insertion coordinates of the structure.
08:33The insertion rim behavior controls how the rim elevation is calculated.
08:40Automatic surface adjustment controls whether the rim elevation is calculated automatically from the surface or is set manually.
08:49The surface adjustment value allows you to set an offset from the calculated surface elevation,
08:56for example to have the structure protrude above the ground.
09:00The sump behavior controls whether a structure has a sump below the pipes,
09:05for example when the structure is a catch pit.
09:10You can set the sump method and depth here.
09:14Again the hydraulic properties are used to provide inputs or store results from drainage analysis applications.
09:22Under part data you can change the structure type and benching method which are used for analysis.
09:29You can change the rim to sump height of the structure and set other values such as wall and floor
09:36thickness and the structure material.
09:40Other dimensions such as frame length and width may not be populated and the available options will vary depending on
09:48the catalogue and the parts that are used.
09:50The inner structure diameter can be used to change the diameter of the manhole.
09:56Change the inner structure diameter to 96 and click apply.
10:01Note the changes in the profile view.
10:04Set it back to 60.
10:07On the connections tab you can review the pipe connections to the structure.
10:12The status column displays the rule status for connected pipes.
10:17In here you can change the elevations and slopes of the pipes.
10:22When selecting multiple pipes you can right click and then match the pipe elevations across the selected pipes.
10:32The rules tab displays the structure rules that are assigned to the structure together with the actual values.
10:39The status column will display any rules that are violated.
10:45Click OK to dismiss the properties.
10:49Now select the Storm1 network in Prospector.
10:52Right click and choose edit network.
10:56This will call up the network layout tools enabling you to add to the network.
11:02On the right hand side of the tools you'll find the pipe network vistas button.
11:06This will open tables for pipes and structures in the panorama viewer which you can use for editing.
11:12Click on the button to open the vistas and then go to the pipes tab.
11:17Here you can see pipe information in tabular form.
11:21Items not greyed out can generally be edited.
11:24The status column displays a summary of rules that are violated.
11:29Note that the inner pipe diameter cannot be edited from here.
11:33You can change the surface and edit the pipe coordinates, elevations or slopes.
11:42Review the properties that are available.
11:45Go to the structures tab.
11:47Again you will see a table of the structure properties.
11:51Where you can edit names, styles, the reference surface and structure coordinates and elevations.
12:02You cannot change the structure diameters here though.
12:06Close the panorama viewer and the network layout tools.
12:11Switch the drawing back to a single viewport.
12:15We need to combine the storm 2 network that runs along woodside view with the storm 1 network for analysis
12:24purposes.
12:25From Prospector click on the storm 2 network, right click and choose select.
12:31From the pipe network contextual ribbon tab on the modify panel choose merge networks.
12:38In the merge dialog select storm 2 as the network to be merged and click OK.
12:46In the destination dialog select storm 1 as the destination network and click OK.
12:53In Prospector you can see there is now only one network, storm 1, and the two networks have been merged.
13:01Now zoom to manhole 2 at the junction of Woodside View and McAllister Boulevard.
13:07At this location there are in fact still two structures.
13:11Manhole 2 is from storm 1 and there is an end structure from the storm 2 network.
13:18In Prospector use the item list view for the structures and sort the list by clicking on the name column
13:26header.
13:27Select structure 15 from the list which was the last structure in the storm 2 network.
13:35Move the cursor into the model space and use the delete key to delete the selected structure.
13:42Then select the last pipe on that run and using the end square grip drag the pipe away from the
13:48structure and then drag it back until the connection symbol is shown.
13:53Then click to reconnect the pipe to the structure.
13:56We now need to rename the pipes and structures that were merged from storm 2 to continue the naming convention
14:03and numbering used in storm 1.
14:06Looking at the pipes in the item list view, the pipes from the storm 2 network have been added but
14:12the names do not match those from storm 1.
14:14From the modify ribbon tab on the design panel click on pipe network then from the modify panel drop down
14:23choose rename parts.
14:27On the command line it is asking for the first part to be renamed.
14:31In the model pan to the first structure on the run and select it and then pan to the last
14:37pipe on the run and select that.
14:40Press enter.
14:42In the rename parts dialog 4 structures and 4 pipes have been selected.
14:47For structures click on the name template button and change the name format for the structures to MH and then
14:54a space and then add the field next counter.
14:58Set the starting number to 12 and click OK.
15:04For pipes set the name template to P with a space and then next counter without the brackets.
15:14Set the starting number to 11.
15:18Select rename existing parts then click OK to rename the structures and pipes.
15:24In Prospector reviewed the pipe and structure, names.
15:30In Prospector, review the pipe and structure names.

Recommended